Knihobot

Identifying and managing project risk essential tools for failure-proofing your project

Hodnocení knihy

Parametry

  • 360 stránek
  • 13 hodin čtení

Více o knize

"The book outlines proven methods for project risk planning, drawing on real-world situations and hundreds of examples - including what many once considered a truly impossible project, the Panama Canal - to demonstrate key ideas in the risk management process. You'll learn how to use high-level risk assessment tools, implement a complete system for monitoring and controlling projects, and properly document every possible consideration. The book contains sections on the different types of risk to consider when planning; how to identify key issues associated with project metrics; activity sequencing; Work Breakdown Structure (WBS);analysis of scale; and cost estimating and budgeting."--BOOK JACKET.

Nákup knihy

Identifying and managing project risk essential tools for failure-proofing your project, Tom Kendrick

Jazyk
Rok vydání
2009
Vazba
(pevná)
Jakmile se objeví, pošleme e-mail.

Doručení

  • Doprava zdarma od 499 Kč po celém Česku! Více info

Platební metody

3,7
Velmi dobrá
39 Hodnocení

Tady nám chybí tvá recenze.

Titul
Identifying and managing project risk essential tools for failure-proofing your project
Jazyk
anglicky
Vydavatel
Amacon
Rok vydání
2009
Vazba
pevná
Počet stran
360
ISBN10
0814413404
ISBN13
9780814413401
Série
Štítky
Byznys
Hodnocení
3,7 z 5
Anotace
"The book outlines proven methods for project risk planning, drawing on real-world situations and hundreds of examples - including what many once considered a truly impossible project, the Panama Canal - to demonstrate key ideas in the risk management process. You'll learn how to use high-level risk assessment tools, implement a complete system for monitoring and controlling projects, and properly document every possible consideration. The book contains sections on the different types of risk to consider when planning; how to identify key issues associated with project metrics; activity sequencing; Work Breakdown Structure (WBS);analysis of scale; and cost estimating and budgeting."--BOOK JACKET.